Saturday, March 28, 2015

Hulls now and then (from May 2009)

I kind of like the see through look.

Monday, March 23, 2015

Two halfs out of the molds

Two halfs out of the molds


Monday, March 16, 2015

Bagging foam core to the outer skin.

Bagging foam core to the outer skin.  Pre-cut pieces of foam core glued and vacuum bagged in mold.

https://youtu.be/q_7xJ5PK4DI

Screwing on toolings for the inner skin and flang

Screwing on toolings for the inner skin and flang.

Started out with #6 screws but 50% stripped !!! needed # 8s  off to Lows,  (closer then HD)

https://youtu.be/XfFWbWHv0jM

Friday, March 13, 2015

Bulkheads installed in first hull half.

Bulkheads installed in first hull half.



Tuesday, March 10, 2015

Core in first quarter

Core vacuum bagged in place,  A little cleanup and the inner skin is next.