The second part is out of the mold. This time after I started the bagging and got a good seal I closed up the room and turned on the heater. After 9 hours at 120 degrees (F) I shut everything down and let it set for 24 hours. After the huls are together I will make a small foam (pink stuff) oven and post cure them at about 140 degrees.
Tuesday, March 31, 2009
Monday, March 23, 2009
First part out of the mold.
Sunday, March 22, 2009
Need room in the workshop.
Saturday, March 21, 2009
First hull part started.
I received 75LBs of epoxy on Wednesday and finished cutting the peelply and breather mat last night so I did the first layup this morning. The outside layer is 2 layers of Style 6580 - 5.7 oz/sq yd - S-2 Glass and a strip of 5" wide and 17' long along the keel area. The inter layer is also 2 layers of 5.7 oz S glass with local reinforcement for bulkheads and other fittings.
Subscribe to:
Posts (Atom)