Bedding the beams in a mixture of thick epoxy and cabosil, then drilling the hole for the retaining studs. I am using 1/4-20 X 3.5 inch SS threaded rod for the studs, these are lighter then I used in my last 18sq meter but I think they have adequate pull out strength.

No comments:
Post a Comment