Installing Bulkheads, The bulkheads are made up of 5mm Okoume plywood with a 2 layers of 5oz glass on them. Then there are blocks of western red cedar for anchoring studs that will attach the cross beams. These will all be fillet and glassed into place.
The second part is out of the mold. This time after I started the bagging and got a good seal I closed up the room and turned on the heater. After 9 hours at 120 degrees (F) I shut everything down and let it set for 24 hours. After the huls are together I will make a small foam (pink stuff) oven and post cure them at about 140 degrees.