Tuesday, March 31, 2009
Second part out of the mold.
The second part is out of the mold. This time after I started the bagging and got a good seal I closed up the room and turned on the heater. After 9 hours at 120 degrees (F) I shut everything down and let it set for 24 hours. After the huls are together I will make a small foam (pink stuff) oven and post cure them at about 140 degrees.
Monday, March 23, 2009
First part out of the mold.
Sunday, March 22, 2009
Need room in the workshop.
Saturday, March 21, 2009
First hull part started.
I received 75LBs of epoxy on Wednesday and finished cutting the peelply and breather mat last night so I did the first layup this morning. The outside layer is 2 layers of Style 6580 - 5.7 oz/sq yd - S-2 Glass and a strip of 5" wide and 17' long along the keel area. The inter layer is also 2 layers of 5.7 oz S glass with local reinforcement for bulkheads and other fittings.
Saturday, February 21, 2009
Divertimento
Sunday, February 1, 2009
Tool to create the Center Board Box
External joining flang
I am creating a recess on the external surface of the hulls to glue glass them together.
First I use 1mm thick soft plastics (shower pan liner) glued into the mold using 3M's 77
spray glue. http://www3.3m.com/catalog/us/en001/office/mounting/node_GSBNWDW69Rbe/root_GST1T4S9TCgv/vroot_GSRCJ327Z3ge/gvel_GSTYR4LHFQgl/theme_us_mounting_3_0/command_AbcPageHandler/output_html

Then cover it with "flash tape" from Aircraft Spruce. http://www.aircraftspruce.com/catalog/cmpages/vb6045.php

First I use 1mm thick soft plastics (shower pan liner) glued into the mold using 3M's 77
spray glue. http://www3.3m.com/catalog/us/en001/office/mounting/node_GSBNWDW69Rbe/root_GST1T4S9TCgv/vroot_GSRCJ327Z3ge/gvel_GSTYR4LHFQgl/theme_us_mounting_3_0/command_AbcPageHandler/output_html

Then cover it with "flash tape" from Aircraft Spruce. http://www.aircraftspruce.com/catalog/cmpages/vb6045.php

Monday, January 5, 2009
Saturday, November 15, 2008
Subscribe to:
Posts (Atom)














